Location
Westminster, London
Client
Geoffrey Osbourne
Architects
Bond Bryan
Engineers
Stantec
Project Value
£3,500,000
A complex multi-site enabling works, groundworks and frame package across three Westminster sites, including Victorian sewer connections, waterproof attenuation tanks and a five-storey insitu concrete frame.




Part of the Westminster Infill Projects, this contract spanned enabling works, groundworks and frame packages across three sites.
Early enabling works included tunnelling a heading under the road to connect to an existing Victorian sewer, constructing a 5m deep manhole with backdrops, and installing a large waterproof attenuation tank.
A crane base with cast-in mast section, installed to tight tolerances, completed the enabling phase.
The groundworks package covered the full range: reduced level dig, ground beams, pile caps, lift pits, drainage, services, underslab cellcore, bentonite waterproofing, a suspended ground floor slab and brickwork to DPC.
The final element was a five-storey insitu concrete frame, with inclined upstands and columns from levels three to five demanding careful temporary works design. Precast stairs to the core completed the scope.